Skip to content

Martin Flashman Weybridge would like to update you on an upcoming summary of Planned Road Improvements in Weybridge Town Centre, so you can plan your travel in advance!

Phased Timeline of Works

  1. Monument Hill and Monument Green Junction Works
    • Planned Timeline: Autumn/Winter 2024-2025
  2. 20mph Speed Limit Implementation
    • Planned Timeline: Spring/Summer 2025
  3. Church Street, Balfour Road, High Street (between Elmgrove Road and Baker Street) Improvements
    • Planned Timeline: Spring/Summer 2025

Key Considerations

  • Delays: Original timelines were adjusted to avoid overlapping with major works at M25 junction 10, which would have caused significant local congestion.
  • Coordination: Surrey Streetworks has synchronized this project with other regional roadworks.

Benefits of the Project

  • Encourage Active Travel: Improved facilities for walking and cycling.
  • Traffic Flow: Reduced congestion and optimized vehicle movement.
  • Environmental Impact: Better air quality through smoother traffic and active travel promotion.
  • Urban Environment: Enhanced streetscape with improved pedestrian crossings and street furniture.

Detailed Changes Proposed for Weybridge Town Centre Improvements

Key Improvements

  1. Pedestrian and Cycling Enhancements:
    • Widening of existing footways.
    • New and improved pedestrian crossings.
    • Introduction of cycling and pedestrian links, routes, and dedicated spaces.
  2. Road and Junction Works:
    • Carriageway improvements.
    • Junction upgrades for smoother traffic flow and safer crossings.
  3. Urban Environment Enhancements:
    • Decluttering unused street furniture.
    • Identifying areas for urban greening.
    • Upgrading street lighting.
    • Installing improved signage.
    • Enhancing public transport facilities, including bus stops and shelters.
  4. Safety Measures:
    • Reduction of vehicle speeds with 20mph posted speed limits.
    • Comprehensive safety improvements throughout the town centre and nearby areas.

 

Additional FAQs

Will all roads be worked on simultaneously?

  • No. Work will be carried out in phases to minimize disruption and ensure coordination with major road closures on the M25 and A3.

What traffic management measures will be in place?

  • Safe and appropriate traffic management systems will be set up to mitigate disruption. While some delays are expected during peak times, careful timing and phased execution will minimize their impact.

How will businesses and residents be affected?

  • Access to homes and businesses will be maintained whenever it is safe to do so. Efforts will focus on minimizing inconvenience.

 

Martin Flashman Weybridge would like to update you on the Weybridge Library.

*Remember, there is a temporary Relocation open now*

  • The library has moved to a temporary location at the Weybridge Centre for the Community. See address and parking details below.
  • Available Services:
    • IT services and self-service kiosks.
    • WiFi, A4 printing, and photocopying.
    • Four public computers.
    •  
  • Note: The Public Computer/Study Room is unavailable on Tuesdays from 9:30 AM to 12:00 PM due to a regular group booking.

Opening Times

Day

Opening Times

Monday

Closed

Tuesday

9:30 AM – 4:30 PM

Wednesday

9:30 AM – 5:00 PM

Thursday

9:30 AM – 1:30 PM

Friday

9:30 AM – 5:00 PM

Saturday

9:30 AM – 5:00 PM

Sunday

Closed

 Address and Parking

  • Address:
    Weybridge Library
    Weybridge Centre for the Community
    Churchfield Place
    Weybridge
    KT13 8BZ
  • Location:
    Situated in Weybridge town centre, off Churchfield Road (on the left) overlooking the Recreation Ground.
  • Parking:
    • A pay-and-display car park is available at the end of Churchfield Road.
    • Disabled parking: Two spaces in the Churchfield Road public car park.

Don’t let traffic hold you back! stay informed and plan ahead for smooth travels in Weybridge!